Copper slag

Results: 45



#Item
11No 3 OctoberMIN-NOVATION MINING AND MINERAL PROCESSING WASTE MANAGEMENT INNOVATION NETWORK  TABLE OF CONTENTS:

No 3 OctoberMIN-NOVATION MINING AND MINERAL PROCESSING WASTE MANAGEMENT INNOVATION NETWORK TABLE OF CONTENTS:

Add to Reading List

Source URL: min-novation.eu

Language: English - Date: 2012-05-03 05:56:18
12Mineral Commodity Summaries 2015

Mineral Commodity Summaries 2015

Add to Reading List

Source URL: minerals.usgs.gov

Language: English - Date: 2015-02-03 11:14:30
13Slag—Iron and Steel 2012

Slag—Iron and Steel 2012

Add to Reading List

Source URL: minerals.usgs.gov

Language: English - Date: 2014-09-08 14:10:38
14Section[removed]Removal of Paint and Painting Steel Bridge Structures[removed]A. REMOVAL OF PAINT. Non-Hazardous Paint Removal.

Section[removed]Removal of Paint and Painting Steel Bridge Structures[removed]A. REMOVAL OF PAINT. Non-Hazardous Paint Removal.

Add to Reading List

Source URL: www.iowadot.gov

Language: English - Date: 2013-09-03 11:14:43
15Copper Cliff Smelter Superstack, Sudbury Metals from Minerals, Managing Environmental Impacts,and Historic Mining Coordinates (46.47949o –81.05943o)

Copper Cliff Smelter Superstack, Sudbury Metals from Minerals, Managing Environmental Impacts,and Historic Mining Coordinates (46.47949o –81.05943o)

Add to Reading List

Source URL: www.sciencenorth.on.ca

Language: English - Date: 2012-10-09 13:24:25
16PHASE 2 STUDY DESIGN/PROTOCOL Based on an understanding of the project objectives, KTA/SET Environmental (KTA/SET) has developed a study protocol for the Phase 2 “field” portion of the project. The protocol is based

PHASE 2 STUDY DESIGN/PROTOCOL Based on an understanding of the project objectives, KTA/SET Environmental (KTA/SET) has developed a study protocol for the Phase 2 “field” portion of the project. The protocol is based

Add to Reading List

Source URL: www.cdc.gov

Language: English - Date: 2012-03-22 13:22:08
17EVALUTION OF SUBSTITUTE MATERIALS FOR SILICA SAND IN ABRASIVE BLASTING CONTRACT No[removed]Prepared For: Department of Health and Human Services

EVALUTION OF SUBSTITUTE MATERIALS FOR SILICA SAND IN ABRASIVE BLASTING CONTRACT No[removed]Prepared For: Department of Health and Human Services

Add to Reading List

Source URL: www.cdc.gov

Language: English - Date: 2012-03-22 13:22:41
18EVALUATION OF SUBSTITUTE MATERIALS FOR SILICA SAND IN ABRASIVE BLASTING CONTRACT No[removed]Prepared For: Department of Health and Human Services

EVALUATION OF SUBSTITUTE MATERIALS FOR SILICA SAND IN ABRASIVE BLASTING CONTRACT No[removed]Prepared For: Department of Health and Human Services

Add to Reading List

Source URL: www.cdc.gov

Language: English - Date: 2012-03-22 13:22:32
19Copper Cliff Smelter Superstack, Sudbury Metals from Minerals, Managing Environmental Impacts,and Historic Mining Coordinates (46.47949o –81.05943o)

Copper Cliff Smelter Superstack, Sudbury Metals from Minerals, Managing Environmental Impacts,and Historic Mining Coordinates (46.47949o –81.05943o)

Add to Reading List

Source URL: sciencenorth.ca

Language: English - Date: 2012-10-09 13:24:25
20Copper Cliff Smelter Superstack, Sudbury Metals from Minerals, Managing Environmental Impacts,and Historic Mining Coordinates (46.47949o –81.05943o)

Copper Cliff Smelter Superstack, Sudbury Metals from Minerals, Managing Environmental Impacts,and Historic Mining Coordinates (46.47949o –81.05943o)

Add to Reading List

Source URL: www.sciencenorth.ca

Language: English - Date: 2014-12-29 15:27:34